Beijing Universal Amusement Park Buried Hot Water Piping Network Project in PASS/START-PROF

Brief Project Description

Universal Studios Beijing is an upcoming Universal theme park that will open in Spring 2021 as part of Universal Beijing Resort. The park would become the fifth Universal Studios-branded theme park in the world, the seventh Universal-built park overall, and the third in Asia.

Universal 1

The buried hot water piping network project was designed by a Chinese company, PASS customer.

Few Technical Details

  • Pipe Diameter: 20 inch or 508 mm,
  • Design Temperature: 85 °C,
  • Insulation: Polyurethane Foam,
  • Depth of Cover: 3.5 m
  • Fluid Carried: Water

For about 5 years, the Chinese PASS/START-PROF distributor Beijing AECsoft Engineering Software sold more than 100 licenses and most of them into the urban heating area.

What is PASS/Start-Prof? Please learn here: //whatispiping.com/start-prof

The article was written by Fluids&Co, learn more.

Video for the Complete Piping Network as analyzed in START-PROF

Print Friendly, PDF & Email

Alex Matveev

Alex Matveev is one of the authors of pipe stress analysis codes GOST 32388-2013 Process Piping, and GOST 55596-2013 District Heating Networks. He is also one of the developers of PASS/Start-Prof software, which is developed since 1965 and used in 95% of process, power, district heating, gas and oil transportation design companies in Russia and CIS countries; it is industry standard in that region. He is the head of the PASS/START-PROF pipe stress analysis software development team. Also, He offers technical support and training for users of their software that number already 3000+, developing since 1965, industry standard in several countries for 50+ years, translated into English in 2017, come out from their domestic market, and started sales for the international market since 2018.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent Posts

Enable Notifications    OK No thanks