What is a Project Manager?A project manager is a person who is responsible for the successful initiation, planning, design, execution, monitoring, controlling, and closure of a project. He is the...
Posts by Anup Kumar Dey
A deluge valve is the critical component of the deluge system used in fire protection services. During fire events, deluge valves are activated quickly and deliver a large volume of water over the...
Front End Engineering Design or FEED is an engineering design approach adopted prior to detailed engineering, procurement, and construction. It is an important engineering design phase that is used...
Maximum shear stress theory provides failure criteria of mechanical components made of a ductile material. This failure criterion is developed by the French mechanical engineer, Henri Tresca and...
What is a Topographic Survey?A topographic survey identifies and measures the exact location, shapes, arrangements, and features of all-natural and manmade features on a specified land surface....
Brownfield vs Greenfield: Differences between a brownfield and greenfield project
The term "Brownfield vs Greenfield" is frequently heard while project execution. This is a very meaningful term for the oil & gas industry. But, the term greenfield vs brownfield is not only...