What is PDMS? Plant Design Management System or PDMS is one of the most widely used engineering design software in the 3D CAD industry for developing or designing plants. UK based MNC AVEVA...
Archives: Blog
The objective of the commissioning To bring the constructed/installed system to deliver the desired function. Pipeline commissioning means introducing crude/ product/Gas in the pipeline from...
Principle of Filled Thermal System This works on the following principle: Liquid or Gas expands when heated and this change in volume is used for measurement. A filled thermal system is...
In a reciprocating compressor, a volume of gas is drawn into a cylinder; it is trapped and compressed by a crankshaft-driven piston and then the high-pressure gas is discharged into the discharge...
Cold Pull: How cold pull is applied at site and its drawback
This article is a continuation of my earlier article on Cold Springing which describes a few basic points regarding Cold Pull or Cold Springing. Click here to refer to that article. How Cold...
Inspection & Test, Marking & Color Coding and Packing Requirements for Pipes & Fittings
The technical requirements for the piping components are mentioned in my earlier post. Click here to refresh those requirements. Additional to those requirements, the Requisition Engineer should...