Skip to content
piping engineers blog
Search
  • Piping Design & Layout
  • Piping Stress Analysis
    • Piping Stress Basics
    • Caesar II
    • Start-Prof
  • Piping Supports
  • Piping Interface
    • Mechanical
    • Process
    • Instrumentation
    • Pipeline
    • Civil
    • Project Management
    • Construction
    • Plumbing
    • Health & Safety
    • Inspection and Testing
    • Maintenance
    • Oil and Gas-Energy
  • Engineering Materials
  • PDMS-E3D
    • PDMS
    • E3D
    • SP3D

Archives: Blog

link to Start-up and Commissioning of the Pipeline

Start-up and Commissioning of the Pipeline

The objective of the commissioning To bring the constructed/installed system to deliver the desired function. Pipeline commissioning means introducing crude/ product/Gas in the pipeline from...

View Post
link to Temperature Measurement by Filled Thermal Systems

Temperature Measurement by Filled Thermal Systems

Principle of Filled Thermal System This works on the following principle: Liquid or Gas expands when heated and this change in volume is used for measurement. A filled thermal system is...

View Post
link to Basics of Reciprocating Compressors / Difference Between Reciprocating Compressor and Rotary Compressor

Basics of Reciprocating Compressors / Difference Between Reciprocating Compressor and Rotary Compressor

In a reciprocating compressor, a volume of gas is drawn into a cylinder; it is trapped and compressed by a crankshaft-driven piston and then the high-pressure gas is discharged into the discharge...

View Post
link to Cold Pull: How cold pull is applied at site and its drawback

Cold Pull: How cold pull is applied at site and its drawback

This article is a continuation of my earlier article on Cold Springing which describes a few basic points regarding Cold Pull or Cold Springing. Click here to refer to that article. How Cold...

View Post
link to Inspection & Test, Marking & Color Coding and Packing Requirements for Pipes & Fittings

Inspection & Test, Marking & Color Coding and Packing Requirements for Pipes & Fittings

The technical requirements for the piping components are mentioned in my earlier post. Click here to refresh those requirements. Additional to those requirements, the Requisition Engineer should...

View Post
link to Design of Cathodic Protection for Duplex Stainless Steel (DSS) Pipeline

Design of Cathodic Protection for Duplex Stainless Steel (DSS) Pipeline

The article is about the Design of Cathodic Protection for Duplex stainless steel. The design includes many parameters like Current density. Coating breakdown factors. Mass of...

View Post
« PREV Page 1 … Page 120 Page 121 Page 122 Page 123 Page 124 … Page 157 NEXT »

About Me

Hi There! Welcome to my space, I am Anup Kumar Dey, an experienced Piping and Pipeline engineer for the last 20 years. Through this platform, I will share my experiences and knowledge with you in an innovative way. So be with me for the next couple of years!

  • CONTACT
  • ABOUT
  • PRIVACY
  • ADVERTISE
  • DISCLAIMER
© 2025 Copyright What is Piping