Skip to content
piping engineers blog
Search
  • Piping Design & Layout
  • Piping Stress Analysis
    • Piping Stress Basics
    • Caesar II
    • Start-Prof
  • Piping Supports
  • Piping Interface
    • Mechanical
    • Process
    • Instrumentation
    • Pipeline
    • Civil
    • Project Management
    • Construction
    • Plumbing
    • Health & Safety
    • Inspection and Testing
    • Maintenance
    • Oil and Gas-Energy
  • Engineering Materials
  • PDMS-E3D
    • PDMS
    • E3D
    • SP3D

Archives: Blog

link to Modular Piping Design- How to do a Piping Stress Analysis

Modular Piping Design- How to do a Piping Stress Analysis

The idea of modular design is as follows: The complex piping system is divided into several modules that are mounted on a frame structure. Modules can be transported to the site and joined to each...

View Post
link to What is a Piping Elbow? | Types of Pipe Elbows

What is a Piping Elbow? | Types of Pipe Elbows

Piping Elbows are very important pipe fitting which is used very frequently for changing direction in the piping, pipeline, and plumbing systems. They are essential pieces of fittings for routing...

View Post
link to Plant Layout Design Rules | Piping Layout Rules

Plant Layout Design Rules | Piping Layout Rules

Plant layout design means efficiently placing equipment, piping, instrumentation, and other manufacturing supports and facilities with proper planning during the design stage to create the most...

View Post
link to Water Hammer Basics in Pumps for Beginners

Water Hammer Basics in Pumps for Beginners

Water Hammer Basics Water hammer, Pressure Surge, or hydraulic shock, is a term for the destructive pressure increase and accompanying shock wave that takes place in pipeline or piping systems...

View Post
link to Check List for Reviewing of Shell & Tube Heat Exchanger Drawings

Check List for Reviewing of Shell & Tube Heat Exchanger Drawings

This article will highlight few of the points that are required to be checked while reviewing Shell & Tube Heat exchanger. The list is not exhaustive but provides a guideline...

View Post
link to Connection Procedure (Alignment) of Process Piping with Rotating Equipment

Connection Procedure (Alignment) of Process Piping with Rotating Equipment

This article provides the necessary brief information to assist the site engineers/field engineers/ construction engineers during the first installation and connection of piping with the relevant...

View Post
« PREV Page 1 … Page 116 Page 117 Page 118 Page 119 Page 120 … Page 159 NEXT »

About Me

Hi There! Welcome to my space, I am Anup Kumar Dey, an experienced Piping and Pipeline engineer for the last 20 years. Through this platform, I will share my experiences and knowledge with you in an innovative way. So be with me for the next couple of years!

  • CONTACT
  • ABOUT
  • PRIVACY
  • ADVERTISE
  • DISCLAIMER
© 2026 Copyright What is Piping