After confirmation of funding gates during FEED; major oil & gas firms prepare the novation stage for Long Lead Items (LLI) with the purpose to deliver early beneficial engineering for the...
Recent Posts
This article will provide a guideline for the selection of metallic pipe flanges and provides information on pressure-temperature ratings, dimensions, tolerances, materials, marking, and testing of...
What is IDC or Inter Discipline Check? IDC or “Inter Discipline Check” is related to the quality of engineering deliverables. This term is frequently used in the engineering design and...
Carbon steel piping with internal PE / ROTO lining is used for liquid service with high chloride as well as higher oxygen content. The maximum operating temperature of the PE & ROTO lined piping...
In my last article on stress analysis of tank piping, I described the effect of tank bulging. Click here to refresh yourself on the effect of storage tank bulging. In this article, I will describe...
Pipe Stress Analysis Report Preparation for Issuing to the Client
Proper documentation of the stress calculation performed using Caesar II or any other stress analysis software is very important as the report or documents are the final deliverables to the client....
